PATENTED TECHNOLOGY • AU PAT. 2014265077

Next-Generation Modular Void Formers for Residential Slabs

A patented 150/225 unified void former system engineered to eliminate multi-SKU site staging, reduce excess concrete volume, and prevent displacement during high-rate pours.

01 — KEY ENGINEERING ADVANTAGES

One system. Engineered for every pour.

FIG. 01 — Topside & underside geometry · service channels · pier apertures

Unified Geometry

Replaces fragmented pod heights with a versatile 150/225 profile, reducing warehouse inventory overhead and site misplacement.

Underside Service Routing

Engineered channels accommodate plumbing and flexible conduit runs before the pour, protecting services from structural pinching.

03

Anti-Displacement Butt-Fit Geometry

Contiguous flush geometry and mass distribution that eliminate lateral drift and pod uplift under high-rate pumping.

04

Reactive Soil Ground Voids

Specially profiled underside cavities provide engineered clearance for soil expansion, reducing risk on reactive sites.

05

Reduced Concrete Volume

Physically tested and monitored comparative slabs confirm reduced cubic concrete volume compared to conventional deep pod systems.

06

Integrated Pier Alignment

Central locator apertures facilitate direct alignment over concrete piers or screw piles for elevated and suspended designs.

02 — REAL-WORLD SITE TRIAL

60-SECOND COMPARATIVE BUILD TRIAL

Side-by-Side Build Comparison

Watch our real-time duplex test slab: KNEWPOD installation speed, structural stability, and concrete placement against a standard waffle pod.

Faster Layout & Reduced Labour

Contiguous butt-fit placement simplifies grid alignment, accelerates installation, and minimises on-site scrap.

Zero Floating During Pour

Engineered stability and mass distribution prevent pod drift and keep structural rib beams uniform under high-rate concrete pumping.

Measured Concrete Reduction

Side-by-side comparative duplex pour confirmed an immediate reduction of 3.6 m³ of concrete over conventional pods.

ORIGIN & ENGINEERING HERITAGE

ENGINEERING ORIGIN • CHRISTCHURCH SEISMIC REBUILD

Born from the Christchurch Earthquakes. Built for Ground Movement.

How a 3:00 AM prototype built from egg crates and toothpicks evolved into a patented, ground-heave foundation system.

Following the catastrophic 2011 Christchurch earthquakes, Kevin Saunders—a 40-year veteran in commercial design and industrial construction—was on the ground assessing severe foundation failures across damaged commercial storage facilities.

Conventional ground-bearing slabs had snapped under lateral soil movement and liquefaction. While void-former waffle rafts offered a lighter, stiffer alternative, standard commercial pods presented dangerous flaws: they shifted and floated during pumping, cracked under crew foot traffic, lacked pile integration, and pinched plumbing services.

The breakthrough came at 3:00 AM, sketching and assembling the first physical prototype out of egg crates and toothpicks. The design solved three critical structural challenges in one stroke: a central aperture to lock directly over in-ground piles, underside expansion voids to allow reactive clay and liquefaction heave without stressing the slab, and pre-pour channels to protect services.

That late-night model evolved into granted Australian and US patents, certified engineering details by Rafzan and Michael Bale & Associates, and a physically monitored system proven to reduce concrete volume while surviving volatile ground conditions.

“Conventional slabs fight the ground until they crack. KNEWPOD was engineered to bridge unstable earth, isolate services, and keep the structure level—no matter what the soil does underneath.”
Kevin SaundersInventor, KnewPod Systems
  • Christchurch Field Inspected
  • AU Standard Patent Granted
  • Zero Slab Drift

03 — PHYSICAL VALIDATION

Engineered & Physically Monitored

Comparative test slab validation conducted under strict commercial site conditions.

Construction crew standing on the installed KnewPod grid across a full duplex test slab, before the concrete pour
Duplex test slab — six-person crew walking the installed pod grid prior to pour.
100%
Controlled Side-by-Side Duplex Comparison
4 Months
Continuous Post-Pour Monitoring
Granted
Standard & Design Patents (AU 2014265077 • US D812780 & D717971)

04 — 3D CAD ENGINEERING BREAKDOWN

Foundation Assembly Sequence

Layer-by-layer architectural breakdown of the internal cross-beams, reinforcement mesh placement, central pier alignment and the completed monolithic topping.

05 — COMMERCIAL ENQUIRY

Request the Commercial Prospectus

For builders, contractors, distributors, engineers and licensing partners. Confidential specification packs are released under mutual commercial NDA.